Semi-Detached Dwelling House @ Toh Crescent

Project Info

  • Construction Date

    12 Months
    (Jan 2025 to Jan 2026)

  • Category

    商业/机构项目, 当前项目, 新加坡

Proposed Reconstruction Of Existing 2-Storey Semi-Detached Dwelling House To A 2-Storey Envelop Control Semi-Detached Dwelling House With Attic On Lot 02417n Mk 31 At Toh Crescent (Pasir Ris Planning Area)